LaFleur Minerals Inc. (CSE: LFLR) (OTCQB: LFLRF) (FSE: 3WK0) reported results from its ongoing drilling program at the Swanson Gold Project, highlighting broad and continuous gold mineralization that supports expansion potential beyond the current mineral resource model and planned open-pit limits. Key intercepts included 2.95 g/t gold over 80.0 meters, 2.37 g/t gold over 88.05 meters and 1.29 g/t gold over 93.85 meters, with drilling targeting previously under-tested areas between 90 and 250 meters vertical depth.
The company said the infill program successfully confirmed continuity of mineralization across large gaps in historic drilling data while also identifying higher-grade sub-intervals, including 232.0 g/t gold over 0.5 meters. LaFleur said the results strengthen confidence in the scale of the Swanson system as it advances development plans tied to its recently released preliminary economic assessment and planned restart of the 100%-owned Beacon Gold Mill. For more details on the press release, visit https://ibn.fm/9utaNA.
These results are significant as they indicate the potential for expanding the resource base and extending the mine life at Swanson, which is strategically located in the Abitibi Gold Belt near Val-d’Or, Québec. The company’s mission is to advance mining projects with a focus on the PEA-stage Swanson Gold Project and the Beacon Gold Mill, which have significant potential to deliver long-term value. The Swanson Gold Project is approximately 19,214 hectares (192 km²) and includes several prospects rich in gold and critical metals previously held by Monarch Mining, Abcourt Mines, and Globex Mining.
LaFleur has consolidated a large land package along a major structural break that hosts the Swanson, Bartec, and Jolin gold deposits and several other showings. The project is easily accessible by road, allowing direct access to several nearby gold mills, further enhancing its development potential. The recently refurbished Beacon Gold Mill is capable of processing over 750 tonnes per day and is being considered for processing mineralized material from Swanson and for custom milling operations for other nearby gold projects. The company recently released positive PEA results for the Swanson Gold Project and the planned restart of the Beacon Gold Mill (refer to press release dated March 3, 2026).
For the latest news and updates relating to LFLRF, visit the company’s newsroom at http://ibn.fm/LFLRF. This information was disseminated by InvestorWire, which is a specialized communications platform focused on advanced wire-grade press release syndication. InvestorWire is one of over 75 brands within the Dynamic Brand Portfolio @ IBN that delivers access to a vast network of wire solutions, article and editorial syndication to over 5,000 outlets, enhanced press release services, social media distribution, and tailored corporate communications solutions.


